Traffic Engineering

 
  • Waitaki District Council Safety Audits

    ViaStrada was commissioned to undertake a series of post construction safety audits for Waitaki District Council. Three audits were carried out: two looking at urban intersection treatments in Oamaru and one looking at five rural pavement rehabilitation projects in the Waitaki District.

    Key Contact: 
    Warren Lloyd
    Contact us for help with a similar project.
    Client: 
    Waitaki District Council
    Location: 
    Waitaki District
    Deliverable: 
    Post Construction Safety Audits
    Project Status: 
    Complete
    Read more...
  • Central City 3 Level Cycling Network

    Project Objective: 
    To develop a user skills / facility type based cycling network for the central city of Hamilton

    The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as identification of current and potential cycle routes.

    Key Contact: 
    Axel Wilke
    Contact us for help with a similar project.
    Client: 
    Hamilton City Council
    Location: 
    Hamilton, NZ
    Deliverable: 
    report, maps
    Project Status: 
    complete
    Read more...
  • Banks Peninsula Data Collection

    Project Objective: 
    Record existing traffic control devices

    The Christchurch City Council now has a record of all the markings and signs on the Peninsula. All traffic control devices requiring a Council resolution have now gone through the correct legislative process. The signs and markings are scheduled in the RAMM database with the respective resolution. The signs were photographed and the condition noted for the maintenance team.

    Key Contact: 
    Warren Lloyd
    Contact us for help with a similar project.
    Client: 
    Christchurch City Council
    Location: 
    Banks Peninsula
    Deliverable: 
    RAMM data, Council resolutions, photos
    Project Status: 
    Completed
    Read more...
  • Clarence Street and Dilworth Street traffic signals

    Project Objective: 
    To scheme design, consult and provide final design plans

    As part of the Westfield expansion of Riccarton Mall, the intersection of Clarence Street and Dilworth Street was converted from a give way intersection to traffic signals. ViaStrada was commissioned by Westfield to design the new layout, undertake the community consultation and prepare final design plans for construction. Finalising the layout required working closely with the Christchurch City Council, the traffic signals contractor and the client. The new intersection with traffic signals was constructed in June 2009.

    Key Contact: 
    Axel Wilke
    Contact us for help with a similar project.
    Client: 
    Westfields
    Location: 
    Christchurch
    Deliverable: 
    Final design plans
    Project Status: 
    Complete
    Read more...
  • Rail Trail traffic counting

    Project Objective: 
    To determine the cycle AADT of the two existing sections of the Little River Rail Trail

    ViaStrada undertook and analysed counts of cycle traffic on the two existing sections of the Little River Rail Trail - between Prebbleton (on the south-western edge of Christchurch) and Lincoln; and between Motukarara and Little River (on Banks Peninsula, halfway to Akaroa). This was done on behalf of the Christchurch City and Selwyn District councils. 

    We estimated the yearly use of the Birchs Road site to be 42,700 cyclists. For the Motukarara to Little River section of the rail trail the annual use was estimated to be 10,200 cyclists.

     

     

     

    Key Contact: 
    Warren Lloyd
    Contact us for help with a similar project.
    Client: 
    Christchurch City Council and Selwyn District Council
    Location: 
    Christchurch City and Selwyn District
    Deliverable: 
    Report outlining methodology and results
    Project Status: 
    Completed June 2008
    Read more...