This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
South Dunedin cycle network scheme design
ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with
…
Read More
Cycle lane separators
ViaStrada was commissioned by VicRoads (the state roading authority of Victoria, Australia) to undertake research on physical bicycle lane separators.
…
Read More
Earthquake recovery streetscape planning for Waimakariri District
Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create
…
Read More
The Brook cycle access
ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a
…
Read More
Kaiapoi town centre – Integrated Transport Plan
The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers,
…
Read More
Williams Street pedestrian count
ViaStrada was commissioned by Waimakariri District Council (WDC) to investigate and quantify the pedestrian activity at five locations on Williams
…
Read More
Red light camera pilot evaluation report peer review
ViaStrada was commissioned by Auckland Transport to edit and review a red light camera pilot evaluation draft report and provide an international
…
Read More
Kaiapoi heavy vehicle tracking tests
We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design
…
Read More
Implementing a central city slow core in Christchurch
Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the
…
Read More
Central city pedestrian Level of Service
Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central
…
Read More
Greymouth pedestrian linkages
John led a study focused on enhancing the walkability of the Greymouth Town Centre. The comprehensive final report covered high level strategic
…
Read More
Safe Routes to School evaluation
ViaStrada was commissioned by Auckland Transport to conduct a crash analysis of pedestrian and cyclist crashes for the five years prior and three
…
Read More
Long Bay network planning
Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay
…
Read More
University to City cycle path scoping study
This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and
…
Read More
Hamilton central city 3-level cycling network
The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as
…
Read More
Cycle counting programme: Hamilton
John, Axel and Jeanette have developed an automatic cycle counting programme for Hamilton City Council (HCC). The project identifies approximate site
…
Read More
Dakota Park roundabout
ViaStrada was commissioned by Christchurch International Airport Ltd to conduct a review of a proposed roundabout at the airport.The objective of the
…
Read More
Christchurch City goes green
The objective of this project was to suggest whether Christchurch City Council (CCC) should continue its use of red coloured surfacing or change to
…
Read More
Green Lights for Bikes
The Melbourne office of SKM engaged ViaStrada to peer review its draft report Green Lights for Bikes, a report on how road authorities can use a range
…
Read More
Road Safety Audit - Invercargill
ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy
…
Read More
Christchurch automatic cycle counting programme
Andrew, Jeanette and Megan developed an automatic cycle counting programme for Christchurch City Council (CCC). The project identifies approximate
…
Read More