This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Palmerston North roundabout safety audits
PNCC engaged ViaStrada to undertake scheme/detail design and post-construction stage road safety audits of a number of roundabout upgrades at city
…
Read More
Spring Creek intersection, Blenheim
How do you design a safe and efficient crossroad intersection on a state highway, in proximity to a railway crossing? You engage ViaStrada to develop
…
Read More
Nazareth House - retirement and aged care village
ViaStrada designed the internal roads for Nazareth House, a retirement village and healthcare complex in Christchurch. The brief was to create a slow
…
Read More
Palmerston North bridge assessment
During 2014, ViaStrada investigated a network of connected shared paths on the southern side (left bank) of the Manawatu River in Palmerston North and
…
Read More
Passing lane and overtaking opportunities
ViaStrada has been engaged to assess the recommendations of the previous studies and identify any additional locations where it may be possible to
…
Read More
South Dunedin cycle network scheme design
ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with
…
Read More
Dunedin cycleway network development
ViaStrada was commissioned by Dunedin City Council and NZTA to develop a cycling network for South Dunedin and the central city.
Read More
Earthquake recovery streetscape planning for Waimakariri District
Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create
…
Read More
The Brook cycle access
ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a
…
Read More
Kaiapoi town centre – Integrated Transport Plan
The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers,
…
Read More
Kaiapoi heavy vehicle tracking tests
We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design
…
Read More
Hastings Walking and Cycling Strategy: beyond iWay
ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs,
…
Read More
Implementing a central city slow core in Christchurch
Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the
…
Read More
Central city pedestrian Level of Service
Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central
…
Read More
Greymouth pedestrian linkages
John led a study focused on enhancing the walkability of the Greymouth Town Centre. The comprehensive final report covered high level strategic
…
Read More
Public transport for Christchurch rebuild
ViaStrada assisted CCC in reviewing options for rapid public transport services to various Christchurch suburbs and provided advice on central city PT
…
Read More
Long Bay network planning
Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay
…
Read More
Christchurch cycle network plan
Christchurch City Council (CCC) as part of the Christchurch Transport Plan (CTP) process commissioned ViaStrada to develop a GIS based cycle network.
…
Read More
University to City cycle path scoping study
This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and
…
Read More
Standardised approach to RoNS in Christchurch
After extensive planning, the NZ Transport Agency (NZTA) has begun construction of a nine-year, $700M+ series of projects, the Christchurch Roads of
…
Read More
Hamilton central city 3-level cycling network
The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as
…
Read More