This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.

Palmerston North roundabout safety audits

PNCC engaged ViaStrada to undertake scheme/detail design and post-construction stage road safety audits of a number of roundabout upgrades at city …
Read More

Spring Creek intersection, Blenheim

How do you design a safe and efficient crossroad intersection on a state highway, in proximity to a railway crossing? You engage ViaStrada to develop …
Read More

Nazareth House - retirement and aged care village

ViaStrada designed the internal roads for Nazareth House, a retirement village and healthcare complex in Christchurch. The brief was to create a slow …
Read More

Palmerston North bridge assessment

During 2014, ViaStrada investigated a network of connected shared paths on the southern side (left bank) of the Manawatu River in Palmerston North and …
Read More

Passing lane and overtaking opportunities

ViaStrada has been engaged to assess the recommendations of the previous studies and identify any additional locations where it may be possible to …
Read More

South Dunedin cycle network scheme design

ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with …
Read More

Dunedin cycleway network development

ViaStrada was commissioned by Dunedin City Council and NZTA to develop a cycling network for South Dunedin and the central city.
Read More

Earthquake recovery streetscape planning for Waimakariri District

Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create …
Read More

The Brook cycle access

ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a …
Read More

Kaiapoi town centre – Integrated Transport Plan

The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers, …
Read More

Kaiapoi heavy vehicle tracking tests

We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design …
Read More

Hastings Walking and Cycling Strategy: beyond iWay

ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs, …
Read More

Implementing a central city slow core in Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the …
Read More

Central city pedestrian Level of Service

Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central …
Read More

Greymouth pedestrian linkages

John led a study focused on enhancing the walkability of the Greymouth Town Centre. The comprehensive final report covered high level strategic …
Read More

Public transport for Christchurch rebuild

ViaStrada assisted CCC in reviewing options for rapid public transport services to various Christchurch suburbs and provided advice on central city PT …
Read More

Long Bay network planning

Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay …
Read More

Christchurch cycle network plan

Christchurch City Council (CCC) as part of the Christchurch Transport Plan (CTP) process commissioned ViaStrada to develop a GIS based cycle network. …
Read More

University to City cycle path scoping study

This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and …
Read More

Standardised approach to RoNS in Christchurch

After extensive planning, the NZ Transport Agency (NZTA) has begun construction of a nine-year, $700M+ series of projects, the Christchurch Roads of …
Read More

Hamilton central city 3-level cycling network

The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as …
Read More