This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
SH6/ Victoria Flats, road intersection upgrade
ViaStrada completed a road safety audit for proposed intersection upgrades at Victoria Flats Road on the Gibbston Highway (SH 6), helping ensure a new
…
Read More
Waipuna Estate – Traffic Impact Assessment (TIA)
Narrow rural roads and busy event venues don't always mix, but careful traffic assessment can show when they do. ViaStrada examined how a proposed
…
Read More
NZTA Mode-shift vs Safety Model update
TGNZ and NZMUGS commissioned ViaStrada to investigate and further update the existing NZTA model determining the estimated safety impacts of mode
…
Read More
42 Roberts Road subdivision preliminary/detailed design safety audits
ViaStrada was commissioned by Mike Greer Homes to conduct two Road Safety Audits for a proposed new subdivision off Roberts Road in Christchurch.
Read More
Prestons Road Safety Audit – Mitre 10 Frontage
ViaStrada was commissioned to carry out a detailed design stage Safe System Audit of the proposed road changes outside Mitre 10 on Prestons Road.
Read More
Lyttelton Port safety reviews and design concepts
The Lyttelton Port needed specific safety expertise to undertake assessments of their main entry gate and adjacent road networks. Using their design
…
Read More
Pukenamu Queens Park ITA and Parking Management Plan
Pukenamu Queens Park is the cultural heart of Whanganui — home to libraries, a gallery, a museum, and memorial spaces that tell the stories of our
…
Read More
Port Tarakohe road access feasibility study
How do you future proof a port access road? ViaStrada evaluated two alignment options for Port Tarakohe and identified a safer, more robust solution
…
Read More
Queenstown area school campus and road safety audits
We were proud to support the Lightfoot Initiative in their mission to reimagine transport for healthier people, communities and the planet. ViaStrada
…
Read More
Buchanans Road caravan park
How do we ensure safe access for a proposed caravan park?
Read More
Driveway access on Christchurch to Akaroa highway
ViaStrada was engaged to help reconfirm driveway access to SH75 for a proposed subdivision along the Christchurch–Akaroa route. Through a detailed
…
Read More
Karori Connections (Botanic Gardens) parking options safety review
ViaStrada conducted an independent safety assessment of several proposed options for adding car parking back in along a 400-metre uphill section of
…
Read More
University guest lectures
For many years, Glen Koorey has regularly delivered guest lectures on traffic engineering, road safety, and sustainable transport topics to various
…
Read More
Greendale Road subdivision Safe System Audit
Through their development consultant DLS, Cressy Properties Limited engaged ViaStrada to conduct a preliminary design stage Safe System Audit for a
…
Read More
Thornton Road Realignment audits, Whakatāne
ViaStrada conducted the detailed design safety and post-construction audits of the Thornton Road re-alignment project. This was a short section of
…
Read More
City to Sea Pathway Safe System Audit
Did you know that pathways in parks are legally roads? Where the Ōtākaro Avon River Corridor shared paths interact with the existing roading network
…
Read More
Safe System Assessments in Christchurch
Safe System assessments evaluate a project’s alignment with Safe System principles and compare various options to determine the most aligned.
Read More
Safe System Audits in Christchurch
ViaStrada has been involved in multiple safe system audits throughout Ōtautahi, including raised signalised intersections, raised pedestrian crossings
…
Read More
Curletts/Yaldhurst Road intersection detailed design Road Safety Audit
We undertook a safe system audit and desktop design review for this intersection for our client.
Read More
Wellington Transitional Cycleway audits
ViaStrada was commissioned by Wellington City Council to audit a series of transitional cycleway projects across Wellington. These projects included
…
Read More
Nelson/Tasman Speed Management Plan Economic Assessment
ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional
…
Read More