Projects
Filter
Buchanans Road caravan park
How do we ensure safe access for a proposed caravan park?
Read More
Driveway access on Christchurch to Akaroa highway
ViaStrada was engaged to help reconfirm driveway access to SH75 for a proposed subdivision along the Christchurch–Akaroa route. Through a detailed
…
Read More
Vogel Street improvements
Vogel Street is set for a transformation into a safe, welcoming shared street for people walking, cycling, and using micromobility. As part of Dunedin
…
Read More
Algona Road Shared Path Feasibility Study
Commissioned by Kingborough Council, ViaStrada delivered a Shared Path Feasibility Study for a proposed 3.2 km path linking Blackmans Bay and
…
Read More
Haven Halifax business case review
The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use
…
Read More
Thornton Road Realignment audits, Whakatāne
ViaStrada conducted the detailed design safety and post-construction audits of the Thornton Road re-alignment project. This was a short section of
…
Read More
Dunedin Ōtepoti Pathways Network Programme
The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to
…
Read More
Nelson/Tasman Speed Management Plan Economic Assessment
ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional
…
Read More
Leith Street Design Concept - Dunedin
ViaStrada's strategic walking and cycling network review in 2024 identified Leith St as a secondary cycle route with a suggestion that it will be a
…
Read More
Tikipunga active travel routes - Single stage business case
The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links
…
Read More
Far North Trails Plan - Te Mahere o ta ara tawhiti ki te Raki
Te Mahere o te ara tawhiti ki te Raki, the Far North Trails Plan had the goal of developing a prioritised list of future routes to extend the walking
…
Read More
Urban Street Design Workshops
New two-day Urban Street Design workshops, developed in collaboration with NZ Transport Agency, share best practice and guidance on multi-modal urban
…
Read More
Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)
The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and
…
Read More
Far North District Council Urban Active Modes Plan
The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to
…
Read More
Dunedin Bike Hubs
ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and
…
Read More
Taupō District Speed Management Plan
ViaStrada was commissioned by Taupō District Council to prepare a Speed Management Plan for their district. The Plan is based on the new Waka Kotahi
…
Read More
National State Highway Speed Management Panel
Where should speed limits change — and why? ViaStrada helped answer that question as part of NZTA’s national panel reviewing speed limits across key
…
Read More
Te Tai Poutini Westland Transport Information
The Department of Conservation commissioned a report and webmap to summarise the transportation context for the Waiau Weheka Westland long term
…
Read More
Whakatāne Innovating Streets
ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More
Mackenzie District Visitor Transport Mapping
The Department of Conservation (DOC) commissioned ViaStrada to create a web map application about transport-related content in Mackenzie District,
…
Read More
Palmerston North urban cycling network masterplan
Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public
…
Read More