This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.

Stops and goes of traffic signals - guidance document update

ViaStrada’s update to the Stops and Goes of Traffic Signals manual is a substantial refresh of the original 2005/2006 guidance, bringing it into line …
Read More

Conservators / Guys / Savills Road DDRSA

ViaStrada was commissioned by e2 Environmental Ltd to undertake a detailed design stage Safe System Audit of intersection improvements at Conservators …
Read More

SH6/ Victoria Flats, road intersection upgrade

ViaStrada completed a road safety audit for proposed intersection upgrades at Victoria Flats Road on the Gibbston Highway (SH 6), helping ensure a new …
Read More

Waipuna Estate – Traffic Impact Assessment (TIA)

Narrow rural roads and busy event venues don't always mix, but careful traffic assessment can show when they do. ViaStrada examined how a proposed …
Read More

NZTA Mode-shift vs Safety Model update

TGNZ and NZMUGS commissioned ViaStrada to investigate and further update the existing NZTA model determining the estimated safety impacts of mode …
Read More

Port Tarakohe road access feasibility study

How do you future proof a port access road? ViaStrada evaluated two alignment options for Port Tarakohe and identified a safer, more robust solution …
Read More

Wellington Older Road Users & Urban Intersections Crash Risk Study

ViaStrada was commissioned by Wellington City to investigate road safety harm across two key areas of concern: crashes involving older road users …
Read More

Buchanans Road caravan park

How do we ensure safe access for a proposed caravan park?
Read More

Driveway access on Christchurch to Akaroa highway

ViaStrada was engaged to help reconfirm driveway access to SH75 for a proposed subdivision along the Christchurch–Akaroa route. Through a detailed …
Read More

Thornton Road Realignment audits, Whakatāne

ViaStrada conducted the detailed design safety and post-construction audits of the Thornton Road re-alignment project. This was a short section of …
Read More

Mode shift impacts on safety

ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole …
Read More

Individual Vehicle Noise Research

This research project looked at the interface between traffic engineering and acoustics, to better understand how road engineering features influence …
Read More

Nelson/Tasman Speed Management Plan Economic Assessment

ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional …
Read More

Far North Trails Plan - Te Mahere o ta ara tawhiti ki te Raki

Te Mahere o te ara tawhiti ki te Raki, the Far North Trails Plan had the goal of developing a prioritised list of future routes to extend the walking …
Read More

Christchurch East bus stop audits

ViaStrada undertook Scheme Design Safe System Audits for Christchurch City’s Linwood Bus Stop Improvements programmes, reviewing proposed bus stop …
Read More

Wellington - City Streets audits

Let's Get Wellington Moving (LGWM) engaged ViaStrada to undertake several safe system audits of proposed corridor and intersection upgrades around …
Read More

Clutha Gold cycle trail extension LCSIAs

ViaStrada were asked to prepare Level Crossing Safety Impact Assessments for three crossings along the extended Clutha Gold cycle trail
Read More

Glenview bus hub

ViaStrada was sub-contracted to design midblock signals for a state highway site in Hamilton’s suburb Glenview. The signals were to accommodate a new …
Read More

Safety of people travelling outside vehicles - deep dive review

Auckland Transport commissioned ViaStrada to carry out a wide-ranging investigation into the extent, nature and causes of serious harm to people …
Read More

Taupō District Speed Management Plan

ViaStrada was commissioned by Taupō District Council to prepare a Speed Management Plan for their district. The Plan is based on the new Waka Kotahi …
Read More

Cycling Demand Model

ViaStrada and WSP developed a GIS and spreadsheet based cycling demand model with an accuracy that is an order of magnitude better than the existing …
Read More