Passing lane and overtaking opportunities

ViaStrada has been engaged to assess the recommendations of the previous studies and identify any additional locations where it may be possible to …
Read More

Glacier pedestrian and cycle access – safety audit

ViaStrada was engaged by DOC to carry out a post construction safety audit of the shared walking and cycle tracks to Franz Josef and Fox glaciers.
Read More

Kaiapoi heavy vehicle tracking tests

We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design …
Read More

Dakota Park roundabout

ViaStrada was commissioned by Christchurch International Airport Ltd to conduct a review of a proposed roundabout at the airport.The objective of the …
Read More

The Catlins, Cathedral Caves access road safety review

ViaStrada was commissioned by the Tautuku Trust to assess the current access road to the Cathedral Caves.  The caves are in an isolated location …
Read More

Waitaki District Council safety audits

ViaStrada was commissioned to undertake a series of post construction safety audits for Waitaki District Council. Three audits were carried out: two …
Read More

Canterbury Regional Cycling Network Development

ViaStrada conducted a desktop analysis using GIS to propose a regional cycle network for Canterbury. This network, and the accompanying discussion …
Read More

FiveMile parking provision plan, Queenstown

The client wanted to show that they had made provision for various on street parking demands in FiveMile. This included short and long term parking …
Read More

Bunnings in Marshland, Christchurch

When the new Bunnings site on Marshland Road was developed, traffic signals were needed to ensure safe site access. ViaStrada was engaged to undertake …
Read More

SH7 and Fairhall Road intersection design, West Coast

SH7 and Fairhall Road intersection design for the Kaiata industrial park. This required a specialist intersection design catering for heavy commercial …
Read More

Five Mile, Frankton/Queenstown

ViaStrada was tasked to assist with gaining NZTA approval for site access to the 32ha Five Mile development from SH6.
Read More

Hussey Road traffic management plan, Christchurch

Recent development of residential subdivisions in the north west of the city has resulted in a substantial increase in traffic activity on a number of …
Read More

North Papanui traffic management plan, Christchurch

The study provides an analysis of the existing traffic environment and makes recommendations on appropriate remedial measures where necessary. The …
Read More

Audit methodology for Canterbury regional cycle network

Environment Canterbury (ECan) is developing a regional cycle network plan. ViaStrada staff developed an audit methodology, enabling alternative …
Read More

Summit Road car parking, Christchurch

The Port Hills is a precious environment that requires sensitive design that meets the need of all users. The objective was to accentuate the passive …
Read More

Chesney St / Scott St, Invercargill – proposed intersection realignment

Invercargill City Council is faced with some challenging traffic engineering at this rural intersection. ViaStrada was commissioned to confirm their …
Read More