Whakatāne Innovating Streets

ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More

Palmerston North urban cycling network masterplan

Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public …
Read More

Main North Road optimisation

In order to optimise the function and safety of the route by mode and time of day, ViaStrada (with Aurecon as a sub-consultant) conducted site audits …
Read More

He Ara Kotahi road safety audit

ViaStrada has been commissioned by the Palmerston North City Council (PNCC) to undertake a NZ Transport Agency (NZTA) compliant scheme stage …
Read More

Puhinui Road, Manukau – concept designs

ViaStrada has been engaged by Auckland Transport to provide concept designs to address outstanding issues from the Puhinui Road Post Construction …
Read More

Napier central city cycling access

To give effect to one of the six City Vision principles - “Pedal Power” – ViaStrada was commissioned to develop recommendations on how to better …
Read More

Belfast / Main North traffic signal audit

ViaStrada staff have safety audited the proposed traffic signals at the intersection of Main North Road with Belfast Road at various project stages. …
Read More

Federal Street road safety audits

ViaStrada was commissioned by Auckland Transport to conduct a post construction safety audit of the Federal Street contra-flow cycle lanes. The …
Read More

Ruapehu - Tongariro National Park Transport Gap Analysis

The Department of Conservation (DOC) commissioned ViaStrada to review a range of planning documents and provide advice to inform Visitor Management …
Read More

Guppy / Meeanee intersection detailed design

In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised …
Read More

Auckland Avondale - New Lynn pathway safety audits

ViaStrada was commissioned by Auckland Transport to conduct a safety audit of the 85% detailed design plans for the Avondale to New Lynn shared path.
Read More

Ron Guthrey Road safety audit

ViaStrada was engaged by Christchurch International Airport Limited (CIAL) to undertake a detail design stage road safety audit of the Ron Guthrey …
Read More

SH2 Marine Parade intersection improvements

ViaStrada was requested by Napier City Council to investigate and assess potential options for upgrading the SH2 intersection of Marine Parade and …
Read More

Audio Tactile Profiled (ATP) Markings on rural shoulders

NZTA commissioned ViaStrada to review the corridors in the Safety Boost programme and identify areas where installing (or not) audio-tactile profiled …
Read More

Te Tuaiwi traffic signals

ViaStrada was contracted by Whanganui District Council to design or retrofit five sets of signalised intersections so that the Te Tuaiwi pathway could …
Read More

Hastings roundabout safety study

Through the iWay network and MoveIt school travel planning programmes, the Hastings District Council (HDC) has identified two corridors presenting …
Read More

Wigram Skies development traffic engineering

ViaStrada was engaged by Ngai Tahu Property Ltd to undertake a post construction road safety audit including day and night time site inspections, of a …
Read More

Latham Street cycleway, Napier - scheme design

The Latham Street – Sale Street corridor in Napier is an arterial road connecting Riverbend Road and Marine Parade over a distance of about 2.0 km. …
Read More

Cycling and Tram Tracks

Christchurch City Council commissioned ViaStrada to investigate concerns about central city tram tracks causing problems for people on bikes. Using a …
Read More

Cycle safety at Blenheim roundabouts

ViaStrada was commissioned by the NZTA to identify up to five intersections with the highest recorded crashes, investigate causal factors and propose …
Read More

SH1 separated cycleway safety audits

ViaStrada was commissioned to conduct safety audits of the uni-directional separated cycleway pair on the one-way system in central Dunedin, on …
Read More