Napier central city cycling access

To give effect to one of the six City Vision principles - “Pedal Power” – ViaStrada was commissioned to develop recommendations on how to better …
Read More

Belfast / Main North traffic signal audit

ViaStrada staff have safety audited the proposed traffic signals at the intersection of Main North Road with Belfast Road at various project stages. …
Read More

Federal Street road safety audits

ViaStrada was commissioned by Auckland Transport to conduct a post construction safety audit of the Federal Street contra-flow cycle lanes. The …
Read More

Guppy / Meeanee intersection detailed design

In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised …
Read More

Auckland Avondale - New Lynn pathway safety audits

ViaStrada was commissioned by Auckland Transport to conduct a safety audit of the 85% detailed design plans for the Avondale to New Lynn shared path.
Read More

Ron Guthrey Road safety audit

ViaStrada was engaged by Christchurch International Airport Limited (CIAL) to undertake a detail design stage road safety audit of the Ron Guthrey …
Read More

SH2 Marine Parade intersection improvements

ViaStrada was requested by Napier City Council to investigate and assess potential options for upgrading the SH2 intersection of Marine Parade and …
Read More

Audio Tactile Profiled (ATP) Markings on rural shoulders

NZTA commissioned ViaStrada to review the corridors in the Safety Boost programme and identify areas where installing (or not) audio-tactile profiled …
Read More

Te Tuaiwi traffic signals

ViaStrada was contracted by Whanganui District Council to design or retrofit five sets of signalised intersections so that the Te Tuaiwi pathway could …
Read More

Hastings roundabout safety study

Through the iWay network and MoveIt school travel planning programmes, the Hastings District Council (HDC) has identified two corridors presenting …
Read More

Wigram Skies development traffic engineering

ViaStrada was engaged by Ngai Tahu Property Ltd to undertake a post construction road safety audit including day and night time site inspections, of a …
Read More

Latham Street cycleway, Napier - scheme design

The Latham Street – Sale Street corridor in Napier is an arterial road connecting Riverbend Road and Marine Parade over a distance of about 2.0 km. …
Read More

Cycling and Tram Tracks

Christchurch City Council commissioned ViaStrada to investigate concerns about central city tram tracks causing problems for people on bikes. Using a …
Read More

Cycle safety at Blenheim roundabouts

ViaStrada was commissioned by the NZTA to identify up to five intersections with the highest recorded crashes, investigate causal factors and propose …
Read More

SH1 separated cycleway safety audits

ViaStrada was commissioned to conduct safety audits of the uni-directional separated cycleway pair on the one-way system in central Dunedin, on …
Read More

Palmerston North cycling network plan

Under secondment to PNCC, ViaStrada's John Lieswyn led the review of the existing cycle network and development of a costed and prioritised list of …
Read More

Napier active transport network planning

ViaStrada undertook a city-wide cycling network evaluation (July 2018). Existing conditions auditing included video and ArcGIS data collector; …
Read More

Blenheim roundabout upgrade

Marlborough Roads engaged ViaStrada to develop an improved roundabout design for the Alabama Road and Weld Street intersection. This site has …
Read More

Eltham Road / Beaver Road concept plan and design

ViaStrada was commissioned to prepare a concept plan with design options for the Eltham Road / Beaver Road corridor, an important north/south …
Read More

Marshland Road audit

ViaStrada was engaged by Christchurch City Council to carry out a scheme design safety audit of a proposed signalised intersection on Marshland Road.
Read More

Ranolf Link road safety audit

ViaStrada was engaged by Rotorua Lakes Council (RLC) to undertake a detail design stage road safety audit of the proposed shared use path on Ranolf …
Read More