SH1 Caversham Valley Road safety audits

ViaStrada was engaged by the NZTA to undertake the detail design and post-construction stage road safety audits of this major upgrade of Dunedin’s …
Read More

Glacier pedestrian and cycle access – safety audit

ViaStrada was engaged by DOC to carry out a post construction safety audit of the shared walking and cycle tracks to Franz Josef and Fox glaciers.
Read More

Hastings Walking and Cycling Strategy: beyond iWay

ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs, …
Read More

Implementing a central city slow core in Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the …
Read More

Central city pedestrian Level of Service

Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central …
Read More

Selwyn District plan review

The Selwyn District Council (SDC) proposes to revise the District Plan's transport provisions to ensure they reflect the strategic direction of …
Read More

SH1 Invercargill roundabout

ViaStrada was engaged by the NZTA to carry out a detail design stage safety audit of a proposed roundabout on Tay Street, Invercargill.
Read More

Public transport for Christchurch rebuild

ViaStrada assisted CCC in reviewing options for rapid public transport services to various Christchurch suburbs and provided advice on central city PT …
Read More

Peer review of proposed Walding Street upgrade - Palmerston North

ViaStrada was commissioned by Palmerston North City Council to peer review the concept plans of proposed changes to Walding Street, an arterial road …
Read More

Road Safety Audit - Invercargill

ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy …
Read More

Albert/Grey Roundabout design audit, Palmerston North

Preliminary design stage safety audit of a proposed roundabout at the intersection of a local road and a collector road. The roundabout is to replace …
Read More

Traffic signal audit on State Highway 73

ViaStrada undertakes a detail design stage safety audit of a new traffic signals for the “Noble Village” subdivision access to the southern side of …
Read More

Safe Routes to School evaluation

ViaStrada was commissioned by Auckland Transport to conduct a crash analysis of pedestrian and cyclist crashes for the five years prior and three …
Read More

Don Buck Road audit

ViaStrada was engaged by Auckland Transport to undertake a scheme design stage road safety audit of a proposed new signalised intersection on a …
Read More

Waitaki District Council safety audits

ViaStrada was commissioned to undertake a series of post construction safety audits for Waitaki District Council. Three audits were carried out: two …
Read More

Christchurch cycle network plan

Christchurch City Council (CCC) as part of the Christchurch Transport Plan (CTP) process commissioned ViaStrada to develop a GIS based cycle network. …
Read More

Cathedral Square signage

Did you know that the Christchurch City Plan requires Resource Consent for any new outdoor advertising on buildings that adjoin Important Open Spaces …
Read More

Westfield Riccarton billboard

ViaStrada obtained resource consent for the erection of a 36m2 advertising billboard at Westfield Riccarton. Our involvement included the preparation …
Read More

Transport planning advice for City Plan/Master Plan alignment

ViaStrada has provided transport planning advice to the Christchurch City Council with respect to the transport-related provisions in the Christchurch …
Read More

Review of transport provisions in Christchurch District Plans

ViaStrada has provided technical assistance to the Christchurch City Council with respect to its review of transport-related provisions in the …
Read More

Standardised approach to RoNS in Christchurch

After extensive planning, the NZ Transport Agency (NZTA) has begun construction of a nine-year, $700M+ series of projects, the Christchurch Roads of …
Read More