This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Active Whakatāne Strategy
ViaStrada worked closely with council staff and community leaders to produce a fun to read strategy and an interactive online map of the walking and
…
Read More
Shirley Boys' High School / Avonside Girls' project road safety audits
How safe was the road environment outside Avonside Girls’ and Shirley Boys’ schools? ViaStrada partnered with CPB Contractors to complete detail
…
Read More
Palmerston North urban cycling network masterplan
Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public
…
Read More
Napier central city cycling access
To give effect to one of the six City Vision principles - “Pedal Power” – ViaStrada was commissioned to develop recommendations on how to better
…
Read More
Redwoodtown School - proposed crossing on Alabama Road
ViaStrada was engaged by Marlborough Roads to investigate a new pedestrian crossing on Alabama Road outside Redwoodtown School to improve safety for
…
Read More
Auckland Avondale - New Lynn pathway safety audits
ViaStrada was commissioned by Auckland Transport to conduct a safety audit of the 85% detailed design plans for the Avondale to New Lynn shared path.
Read More
Audio Tactile Profiled (ATP) Markings on rural shoulders
NZTA commissioned ViaStrada to review the corridors in the Safety Boost programme and identify areas where installing (or not) audio-tactile profiled
…
Read More
Latham Street cycleway, Napier - scheme design
The Latham Street – Sale Street corridor in Napier is an arterial road connecting Riverbend Road and Marine Parade over a distance of about 2.0 km.
…
Read More
Hillview School mid-block crossing audit
How do we ensure students can cross the road safely to get to school? ViaStrada was commissioned to conduct a detail design stage road safety audit of
…
Read More
Papanui Road at St Andrew’s College mid-block crossing audit
ViaStrada was commissioned to conduct a detail design stage road safety audit of the proposed mid-block signalised pedestrian crossing on Papanui Road
…
Read More
Te Uru Tarata Lemonwood Grove School & Waitaha School carpark
ViaStrada was engaged by Lemonwood Grove School Board of Trustees to undertake a post-construction safety audit of a shared carpark serving Lemonwood
…
Read More
Cycling and Tram Tracks
Christchurch City Council commissioned ViaStrada to investigate concerns about central city tram tracks causing problems for people on bikes. Using a
…
Read More
Biketober Christchurch 2017
Sometimes, we work for the love of it to give back to the community. Biketober in 2017 was an example of this, being a month-long festival of various
…
Read More
Cycle safety at Blenheim roundabouts
ViaStrada was commissioned by the NZTA to identify up to five intersections with the highest recorded crashes, investigate causal factors and propose
…
Read More
Palmerston North cycling network plan
Under secondment to PNCC, ViaStrada's John Lieswyn led the review of the existing cycle network and development of a costed and prioritised list of
…
Read More
Dunedin Central City schools cluster road safety
For five schools in the central city, ViaStrada developed an area-wide plan for road safety improvements including options for optimising on
…
Read More
Blenheim roundabout upgrade
Marlborough Roads engaged ViaStrada to develop an improved roundabout design for the Alabama Road and Weld Street intersection. This site has
…
Read More
South Hornby School Kea Crossing – Post-Construction Safety Review
Keeping young pedestrians safe with a critical eye on the details.
Read More
Palmerston North Bikes in Schools review
The Palmerston North City Council has implemented Bikes in Schools at six local schools. As part of ongoing efforts to ensure continuous improvement,
…
Read More
Hastings District school travel plans
ViaStrada's John Lieswyn led the development of travel plans for nine primary and high schools within the Hastings District and assisted the Hastings
…
Read More
Study of signalised intersections and protected bike lanes
In 2016, the IPENZ Transportation Group committee granted their annual study award to two members, Megan Fowler (ViaStrada) and Claire Graham
…
Read More