Projects
Filter
70 Gloucester Street End of Trip (EoT) facilities
Enhancing access for Christchurch’s active commuters, the 70 Gloucester Street upgrade adds bicycle and micro mobility parking, showers, and lockers.
…
Read More
42 Roberts Road subdivision preliminary/detailed design safety audits
ViaStrada was commissioned by Mike Greer Homes to conduct two Road Safety Audits for a proposed new subdivision off Roberts Road in Christchurch.
Read More
Buchanans Road caravan park
How do we ensure safe access for a proposed caravan park?
Read More
Vogel Street improvements
Vogel Street is set for a transformation into a safe, welcoming shared street for people walking, cycling, and using micromobility. As part of Dunedin
…
Read More
Path Speed Management Research
New Zealand Transport Agency Waka Kotahi commissioned ViaStrada to study how well horizontal and vertical design features manage path user speed,
…
Read More
Haven/Halifax business case and design review
The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use
…
Read More
Mode shift impacts on safety
ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole
…
Read More
Brew Moon resource consent
Brew Moon's success means an expansion is on the cards, triggering the need to apply for a resource consent amendment. ViaStrada provided the traffic
…
Read More
Micromobility speed, gender and device type surveys
How fast do e-bike and e-scooter riders go? Is e-mobility helping to address the gender imbalance? Following on from surveys of cycleway user speed,
…
Read More
Queenstown Airport parking & access concept development
A significant increase in passenger numbers at Queenstown Airport put pressure on many parts of the existing infrastructure. ViaStrada developed
…
Read More
Leith Street Design Concept - Dunedin
ViaStrada's strategic walking and cycling network review in 2024 identified Leith St as a secondary cycle route with a suggestion that it will be a
…
Read More
Beale & Cullen Dental transport assessment
ViaStrada was commissioned to provide a traffic assessment for Beale and Cullen Dental practice at 393 Papanui Road for the fulfilment of a
…
Read More
Te Tirohanga Housing Project
ViaStrada provided expert advice on the Request for Information content, draft and final consent conditions for a large land development featuring
…
Read More
Waimakariri Junction Intersection
Traffic engineering and signalised intersection with Smith Street adjacent to SH1 for a large format retail centre.
Read More
Northcote Road signals
TSA on behalf of the Catholic Diocese of Christchurch contracted ViaStrada to produce a concept and detailed design for pedestrian improvements across
…
Read More
Greers / Wairakei Parking Assessment
Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for
…
Read More
Kennedy-Tennyson intersection improvements, Napier
ViaStrada delivered a comprehensive solution for Tennyson Street signal-controlled intersections, integrating separated cycleways for enhanced safety
…
Read More
Christchurch high risk corridor intersection prioritisation
Using multiple sets of data to create a large GIS database we determined the highest-risk arterial corridor intersections and identified which of
…
Read More
Hone Heke / Cobham roundabout
Kerikeri is growing fast, and with growth comes traffic congestion. The Hone Heke / Cobham intersection is becoming more and more difficult to
…
Read More
E-scooter court evidence
ViaStrada was commissioned by legal representatives of three e-scooter sharing companies to prepare an affidavit for the court on the safety and
…
Read More
Whakatāne roundabout projects (x2)
ViaStrada specialises in safe, user-friendly roundabout designs. These roundabouts had unique design challenges to tackle; one constrained by
…
Read More