This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
SH6/ Victoria Flats, road intersection upgrade
ViaStrada completed a road safety audit for proposed intersection upgrades at Victoria Flats Road on the Gibbston Highway (SH 6), helping ensure a new
…
Read More
Waipuna Estate – Traffic Impact Assessment (TIA)
Narrow rural roads and busy event venues don't always mix, but careful traffic assessment can show when they do. ViaStrada examined how a proposed
…
Read More
NZTA Mode-shift vs Safety Model update
TGNZ and NZMUGS commissioned ViaStrada to investigate and further update the existing NZTA model determining the estimated safety impacts of mode
…
Read More
Driver competency and knowledge over time
ViaStrada and Mackie Research were commissioned by AA Research Foundation to investigate how driver knowledge changes over time and how it could be
…
Read More
70 Gloucester Street End of Trip (EoT) facilities
Enhancing access for Christchurch’s active commuters, the 70 Gloucester Street upgrade adds bicycle and micro mobility parking, showers, and lockers.
…
Read More
Metro Christchurch customer insights meta-analysis
Listening to our communities: Shaping the future of public transport. Environment Canterbury recently partnered with ViaStrada to dive deep into what
…
Read More
Pukenamu Queens Park ITA and Parking Management Plan
Pukenamu Queens Park is the cultural heart of Whanganui — home to libraries, a gallery, a museum, and memorial spaces that tell the stories of our
…
Read More
Port Tarakohe road access feasibility study
How do you future proof a port access road? ViaStrada evaluated two alignment options for Port Tarakohe and identified a safer, more robust solution
…
Read More
VKT impacts of road space reallocation
ViaStrada was commissioned by NZTA to investigate the measured network vehicle-kilometres-travelled (VKT) impacts of permanent road space reallocation
…
Read More
Buchanans Road caravan park
How do we ensure safe access for a proposed caravan park?
Read More
Driveway access on Christchurch to Akaroa highway
ViaStrada was engaged to help reconfirm driveway access to SH75 for a proposed subdivision along the Christchurch–Akaroa route. Through a detailed
…
Read More
Vogel Street improvements
Vogel Street is set for a transformation into a safe, welcoming shared street for people walking, cycling, and using micromobility. As part of Dunedin
…
Read More
Path Speed Management Research
New Zealand Transport Agency Waka Kotahi commissioned ViaStrada to study how well horizontal and vertical design features manage path user speed,
…
Read More
Wellington bicycle and scooter cordon count
How can monitoring the number, gender, and road position of people entering Wellington’s central city by bike or scooter help shape the future of
…
Read More
Algona Road Shared Path Feasibility Study
Commissioned by Kingborough Council, ViaStrada delivered a Shared Path Feasibility Study for a proposed 3.2 km path linking Blackmans Bay and
…
Read More
Thornton Road Realignment audits, Whakatāne
ViaStrada conducted the detailed design safety and post-construction audits of the Thornton Road re-alignment project. This was a short section of
…
Read More
Mode shift impacts on safety
ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole
…
Read More
Whakatāne Crossings
People want to cross the road safely and conveniently - is a splash of red paint the solution?
Read More
Dunedin Monitoring Framework Stocktake - Stage 1
The client has many different sources of transport information and called upon ViaStrada to help collate these, map them against the Land Transport
…
Read More
Micromobility speed, gender and device type surveys
How fast do e-bike and e-scooter riders go? Is e-mobility helping to address the gender imbalance? Following on from surveys of cycleway user speed,
…
Read More
Wellington Transitional Cycleway audits
ViaStrada was commissioned by Wellington City Council to audit a series of transitional cycleway projects across Wellington. These projects included
…
Read More