This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Lyttelton Port cruise ship bus parking
Improving the arrival experience at Lyttelton Port, ViaStrada helped explore safer and more efficient traffic management options for cruise ship
…
Read More
Minimum walking data requirements to progress pedestrian safety
How do we measure progress toward zero pedestrian deaths? ViaStrada research for Austroads identified the essential pedestrian data needed to support
…
Read More
NZTA Mode-shift vs Safety Model update
TGNZ and NZMUGS commissioned ViaStrada to investigate and further update the existing NZTA model determining the estimated safety impacts of mode
…
Read More
Driver competency and knowledge over time
ViaStrada and Mackie Research were commissioned by AA Research Foundation to investigate how driver knowledge changes over time and how it could be
…
Read More
70 Gloucester Street End of Trip (EoT) facilities
Enhancing access for Christchurch’s active commuters, the 70 Gloucester Street upgrade adds bicycle and micro mobility parking, showers, and lockers.
…
Read More
Pukenamu Queens Park ITA and Parking Management Plan
Pukenamu Queens Park is the cultural heart of Whanganui — home to libraries, a gallery, a museum, and memorial spaces that tell the stories of our
…
Read More
VKT impacts of road space reallocation
ViaStrada was commissioned by NZTA to investigate the measured network vehicle-kilometres-travelled (VKT) impacts of permanent road space reallocation
…
Read More
Auckland speed limit reversals peer review
ViaStrada was commissioned by Auckland Transport to independently review their programme of 1,554 speed limit reversals required under the 2024 Speed
…
Read More
Mode shift impacts on safety
ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole
…
Read More
Brew Moon resource consent
Brew Moon's success means an expansion is on the cards, triggering the need to apply for a resource consent amendment. ViaStrada provided the traffic
…
Read More
Queenstown Airport parking & access concept development
A significant increase in passenger numbers at Queenstown Airport put pressure on many parts of the existing infrastructure. ViaStrada developed
…
Read More
Nelson/Tasman Speed Management Plan Economic Assessment
ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional
…
Read More
Invercargill school speed limits
ViaStrada undertook comprehensive planning and design for variable speed limits at Invercargill schools, from local streets to state highways, helping
…
Read More
Beale & Cullen Dental transport assessment
ViaStrada was commissioned to provide a traffic assessment for Beale and Cullen Dental practice at 393 Papanui Road for the fulfilment of a
…
Read More
Reducing car dependency in the Pacific Islands
John Lieswyn was recruited by the World Bank to join an international cast of subject matter experts producing a comprehensive report on ways to
…
Read More
Kings Road liveable street, Paihia
Kings Road reimagined: following strong community feedback in 2023, a concept design was developed for Kings Road to create a safer, more attractive
…
Read More
Greers / Wairakei Parking Assessment
Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for
…
Read More
Whangārei Bike Hubs
ViaStrada was commissioned by WDC to scope, recommend, prioritise and design secure bike parking at various sites in Whangārei.
Read More
Dunedin Bike Hubs
ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and
…
Read More
Northland Local Area Traffic Management and Speed Management Improvements (2020-2023)
Over several projects delivered between 2020 and 2023, ViaStrada visited towns across Northland and met with residents to understand their road safety
…
Read More
Regional Speed Management Plan workshops
ViaStrada helped facilitate three industry workshops bringing together regional and local authority reps to coordinate Regional Speed Management Plans
…
Read More