Algona Road Shared Path Feasibility Study

Commissioned by Kingborough Council, ViaStrada delivered a Shared Path Feasibility Study for a proposed 3.2 km path linking Blackmans Bay and …
Read More

Haven Halifax business case review

The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use …
Read More

Mode shift impacts on safety

ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole …
Read More

Streets for People - Aranui Connections

Christchurch City Council and ViaStrada worked together, providing technical advice and input from initial concept, scheme through to detailed design …
Read More

Dunedin Ōtepoti Pathways Network Programme

The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to …
Read More

Whangārei School Travel Plans

Whangārei has an opportunity to encourage active transport to school through a travel planning programme. Some schools have Bike Ready cycle skills …
Read More

Nelson/Tasman Speed Management Plan Economic Assessment

ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional …
Read More

Tikipunga active travel routes - Single stage business case

The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links …
Read More

Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)

The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and …
Read More

Far North District Council Urban Active Modes Plan

The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to …
Read More

Dunedin Bike Hubs

ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and …
Read More

Dunedin Tertiary Area Shared Space Investigation

ViaStrada provided professional advice to council staff so they in turn could have a discussion with elected members regarding the Albany Street …
Read More

Safety of people travelling outside vehicles - deep dive review

Auckland Transport commissioned ViaStrada to carry out a wide-ranging investigation into the extent, nature and causes of serious harm to people …
Read More

Western Bay Sub-region Travel Demand Management (TDM) Scoping Study

ViaStrada supported Vitruvius by preparing an online StoryMap of Travel Demand Management case studies, assessing travel demand by each mode, existing …
Read More

Costs of road transport "accidents"

ViaStrada delivered a working paper summarising the methodology and calculations to derive estimates of the Total (Social) Costs, Average Costs, …
Read More

Cycling Demand Model

ViaStrada and WSP developed a GIS and spreadsheet based cycling demand model with an accuracy that is an order of magnitude better than the existing …
Read More

Infrastructure for quick-build cycleways

Waka Kotahi commissioned ViaStrada to undertake research on quick-build (interim) cycleway infrastructure. This research note provides information …
Read More

Whakatāne Innovating Streets

ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More

Palmerston North urban cycling network masterplan

Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public …
Read More

Ruapehu - Tongariro National Park Transport Gap Analysis

The Department of Conservation (DOC) commissioned ViaStrada to review a range of planning documents and provide advice to inform Visitor Management …
Read More

Cycle safety at Blenheim roundabouts

ViaStrada was commissioned by the NZTA to identify up to five intersections with the highest recorded crashes, investigate causal factors and propose …
Read More