Lyttelton Port safety reviews and design concepts

The Lyttelton Port needed specific safety expertise to undertake assessments of their main entry gate and adjacent road networks. Using their design …
Read More

Dunedin Ōtepoti Pathways Network Programme

The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to …
Read More

Nelson/Tasman Speed Management Plan Economic Assessment

ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional …
Read More

Leith Street Design Concept - Dunedin

ViaStrada's strategic walking and cycling network review in 2024 identified Leith St as a secondary cycle route with a suggestion that it will be a …
Read More

Tikipunga active travel routes - Single stage business case

The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links …
Read More

Waimakariri Junction Intersection

Traffic engineering and signalised intersection with Smith Street adjacent to SH1 for a large format retail centre. 
Read More

Urban Street Design Workshops

New two-day Urban Street Design workshops, developed in collaboration with NZ Transport Agency, share best practice and guidance on multi-modal urban …
Read More

Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)

The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and …
Read More

Far North District Council Urban Active Modes Plan

The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to …
Read More

Northcote Road signals

TSA on behalf of the Catholic Diocese of Christchurch contracted ViaStrada to produce a concept and detailed design for pedestrian improvements across …
Read More

Greers / Wairakei Parking Assessment

Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for …
Read More

Kennedy-Tennyson intersection improvements

ViaStrada delivered a comprehensive solution for Tennyson Street signal-controlled intersections, integrating separated cycleways for enhanced safety …
Read More

Dunedin Bike Hubs

ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and …
Read More

Hone Heke / Cobham roundabout

Kerikeri is growing fast, and with growth comes traffic congestion. The Hone Heke / Cobham intersection is becoming more and more difficult to …
Read More

Whakatāne roundabout projects (x2)

ViaStrada specialises in safe, user-friendly roundabout designs. These roundabouts had unique design challenges to tackle; one constrained by …
Read More

Whakatāne Innovating Streets

ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More

Palmerston North urban cycling network masterplan

Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public …
Read More

Main North Road optimisation

In order to optimise the function and safety of the route by mode and time of day, ViaStrada (with Aurecon as a sub-consultant) conducted site audits …
Read More

Ruapehu - Tongariro National Park Transport Gap Analysis

The Department of Conservation (DOC) commissioned ViaStrada to review a range of planning documents and provide advice to inform Visitor Management …
Read More

Guppy / Meeanee intersection detailed design

In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised …
Read More

Te Tuaiwi traffic signals

ViaStrada was contracted by Whanganui District Council to design or retrofit five sets of signalised intersections so that the Te Tuaiwi pathway could …
Read More