This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Mt Maunganui speed and safety review
ViaStrada was commissioned by Tauranga City to assess the effectiveness of the 30 km/h zone in Mount Maunganui, in terms of vehicle speeds and crashes
…
Read More
Canterbury Regional Speed Management Plan
ViaStrada was commissioned by Environment Canterbury (ECan), on behalf of the Regional Road Safety Working Group (RRSWG), to undertake different tasks
…
Read More
Redwoodtown School - proposed crossing on Alabama Road
ViaStrada was engaged by Marlborough Roads to investigate a new pedestrian crossing on Alabama Road outside Redwoodtown School to improve safety for
…
Read More
Guppy / Meeanee intersection detailed design, Napier
In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised
…
Read More
SH2 Napier Marine Parade intersection improvements
ViaStrada was requested by Napier City Council to investigate and assess potential options for upgrading the SH2 intersection of Marine Parade and
…
Read More
Hillview School mid-block crossing audit
How do we ensure students can cross the road safely to get to school? ViaStrada was commissioned to conduct a detail design stage road safety audit of
…
Read More
Papanui Road at St Andrew’s College mid-block crossing audit
ViaStrada was commissioned to conduct a detail design stage road safety audit of the proposed mid-block signalised pedestrian crossing on Papanui Road
…
Read More
Biketober Christchurch 2017
Sometimes, we work for the love of it to give back to the community. Biketober in 2017 was an example of this, being a month-long festival of various
…
Read More
Dunedin Central City schools cluster road safety
For five schools in the central city, ViaStrada developed an area-wide plan for road safety improvements including options for optimising on
…
Read More
Napier active transport network planning
ViaStrada undertook a city-wide cycling network evaluation (July 2018). Existing conditions auditing included video and ArcGIS data collector;
…
Read More
Palmerston North Bikes in Schools review
The Palmerston North City Council has implemented Bikes in Schools at six local schools. As part of ongoing efforts to ensure continuous improvement,
…
Read More
Wakapuaka subdivision capacity assessment of local roads
ViaStrada was engaged by the NZ Transport Agency to assess the impact of a proposed new subdivision on the existing local road network.
Read More
Regulations and safety for electric bicycles and other low-powered vehicles
E-bikes and e-scooters (collectively, “micromobility”) are transforming our world. They are outselling electric cars – but our street design and
…
Read More
Hastings District school travel plans
ViaStrada's John Lieswyn led the development of travel plans for nine primary and high schools within the Hastings District and assisted the Hastings
…
Read More
Investigating road user rules for people walking and cycling
The NZ Transport Agency engaged ViaStrada to investigate options for amendments to several road user rules affecting walking and cycling, particularly
…
Read More
NSW Fatigue-related rural road crashes & solutions
Transport for New South Wales commissioned ViaStrada to create a benefit-cost analysis tool that assesses measures that prevent fatigue-related road
…
Read More
Palmerston North bridge assessment
During 2014, ViaStrada investigated a network of connected shared paths on the southern side (left bank) of the Manawatu River in Palmerston North and
…
Read More
Passing lane and overtaking opportunities
ViaStrada has been engaged to assess the recommendations of the previous studies and identify any additional locations where it may be possible to
…
Read More
Dunedin cycleway network development
ViaStrada was commissioned by Dunedin City Council and NZTA to develop a cycling network for South Dunedin and the central city.
Read More
Hastings Walking and Cycling Strategy: beyond iWay
ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs,
…
Read More
Implementing a central city slow core in Christchurch
Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the
…
Read More