Projects
Filter
Path Speed Management Research
New Zealand Transport Agency Waka Kotahi commissioned ViaStrada to study how well horizontal and vertical design features manage path user speed,
…
Read More
Shands Road Sawmill Integrated Transport Assessment
ViaStrada completed a comprehensive Integrated Transport Assessment (ITA) to support the development of a proposed new biofuel pellet plant
…
Read More
Algona Road Shared Path Feasibility Study
Commissioned by Kingborough Council, ViaStrada delivered a Shared Path Feasibility Study for a proposed 3.2 km path linking Blackmans Bay and
…
Read More
Haven Halifax business case review
The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use
…
Read More
Mode shift impacts on safety
ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole
…
Read More
Micromobility speed, gender and device type surveys
How fast do e-bike and e-scooter riders go? Is e-mobility helping to address the gender imbalance? Following on from surveys of cycleway user speed,
…
Read More
Dunedin Ōtepoti Pathways Network Programme
The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to
…
Read More
Nelson/Tasman Speed Management Plan Economic Assessment
ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional
…
Read More
Tikipunga active travel routes - Single stage business case
The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links
…
Read More
Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)
The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and
…
Read More
Far North District Council Urban Active Modes Plan
The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to
…
Read More
Kennedy-Tennyson intersection improvements, Napier
ViaStrada delivered a comprehensive solution for Tennyson Street signal-controlled intersections, integrating separated cycleways for enhanced safety
…
Read More
Dunedin Bike Hubs
ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and
…
Read More
Hone Heke / Cobham roundabout
Kerikeri is growing fast, and with growth comes traffic congestion. The Hone Heke / Cobham intersection is becoming more and more difficult to
…
Read More
E-scooter court evidence
ViaStrada was commissioned by legal representatives of three e-scooter sharing companies to prepare an affidavit for the court on the safety and
…
Read More
Infrastructure for quick-build cycleways
Waka Kotahi commissioned ViaStrada to undertake research on quick-build (interim) cycleway infrastructure. This research note provides information
…
Read More
University of Canterbury guest lectures
Since 2006, Axel Downard-Wilke has been a guest lecturer at the University of Canterbury for the Masters of Transportation course and occasional
…
Read More
Whakatāne Innovating Streets
ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More
Palmerston North urban cycling network masterplan
Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public
…
Read More
Ruapehu - Tongariro National Park Transport Gap Analysis
The Department of Conservation (DOC) commissioned ViaStrada to review a range of planning documents and provide advice to inform Visitor Management
…
Read More
Guppy / Meeanee intersection detailed design, Napier
In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised
…
Read More