This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.

Stops and goes of traffic signals - guidance document update

ViaStrada’s update to the Stops and Goes of Traffic Signals manual is a substantial refresh of the original 2005/2006 guidance, bringing it into line …
Read More

NZTA Mode-shift vs Safety Model update

TGNZ and NZMUGS commissioned ViaStrada to investigate and further update the existing NZTA model determining the estimated safety impacts of mode …
Read More

70 Gloucester Street End of Trip (EoT) facilities

Enhancing access for Christchurch’s active commuters, the 70 Gloucester Street upgrade adds bicycle and micro mobility parking, showers, and lockers. …
Read More

Pukenamu Queens Park ITA and Parking Management Plan

Pukenamu Queens Park is the cultural heart of Whanganui — home to libraries, a gallery, a museum, and memorial spaces that tell the stories of our …
Read More

Wellington Older Road Users & Urban Intersections Crash Risk Study

ViaStrada was commissioned by Wellington City to investigate road safety harm across two key areas of concern: crashes involving older road users …
Read More

Shands Road Sawmill Integrated Transport Assessment

ViaStrada completed a comprehensive Integrated Transport Assessment (ITA) to support the development of a proposed new biofuel pellet plant …
Read More

Haven/Halifax business case and design review

The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use …
Read More

Mode shift impacts on safety

ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole …
Read More

Individual Vehicle Noise Research

This research project looked at the interface between traffic engineering and acoustics, to better understand how road engineering features influence …
Read More

Brew Moon resource consent

Brew Moon's success means an expansion is on the cards, triggering the need to apply for a resource consent amendment. ViaStrada provided the traffic …
Read More

Queenstown Airport parking & access concept development

A significant increase in passenger numbers at Queenstown Airport put pressure on many parts of the existing infrastructure. ViaStrada developed …
Read More

Beale & Cullen Dental transport assessment

ViaStrada was commissioned to provide a traffic assessment for Beale and Cullen Dental practice at 393 Papanui Road for the fulfilment of a …
Read More

Greers / Wairakei Parking Assessment

Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for …
Read More

Whangārei Bike Hubs

ViaStrada was commissioned by WDC to scope, recommend, prioritise and design secure bike parking at various sites in Whangārei.
Read More

Kennedy-Tennyson intersection improvements, Napier

ViaStrada delivered a comprehensive solution for Tennyson Street signal-controlled intersections, integrating separated cycleways for enhanced safety …
Read More

Dunedin Bike Hubs

ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and …
Read More

Hone Heke / Cobham roundabout

Kerikeri is growing fast, and with growth comes traffic congestion. The Hone Heke / Cobham intersection is becoming more and more difficult to …
Read More

Safety of people travelling outside vehicles - deep dive review

Auckland Transport commissioned ViaStrada to carry out a wide-ranging investigation into the extent, nature and causes of serious harm to people …
Read More

Dunedin parking surveys

Dunedin City Council staff asked ViaStrada to set up and complete a survey of parking demand in the city centre. The aim was to provide a …
Read More

Cycling Demand Model

ViaStrada and WSP developed a GIS and spreadsheet based cycling demand model with an accuracy that is an order of magnitude better than the existing …
Read More

Infrastructure for quick-build cycleways

Waka Kotahi commissioned ViaStrada to undertake research on quick-build (interim) cycleway infrastructure. This research note provides information …
Read More