Lyttelton Port safety reviews and design concepts

The Lyttelton Port needed specific safety expertise to undertake assessments of their main entry gate and adjacent road networks. Using their design …
Read More

Mode shift impacts on safety

ViaStrada was commissioned by NZTA to undertake research on the overall safety impacts of mode shift away from private motorised vehicles to whole …
Read More

Dunedin Ōtepoti Pathways Network Programme

The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to …
Read More

Nelson/Tasman Speed Management Plan Economic Assessment

ViaStrada was commissioned to assess and report on the economic benefits of four urban and four rural options for the proposed Nelson/Tasman Regional …
Read More

Leith Street Design Concept - Dunedin

ViaStrada's strategic walking and cycling network review in 2024 identified Leith St as a secondary cycle route with a suggestion that it will be a …
Read More

Tikipunga active travel routes - Single stage business case

The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links …
Read More

Waimakariri Junction Intersection

Traffic engineering and signalised intersection with Smith Street adjacent to SH1 for a large format retail centre. 
Read More

Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)

The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and …
Read More

Far North District Council Urban Active Modes Plan

The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to …
Read More

Northcote Road signals

TSA on behalf of the Catholic Diocese of Christchurch contracted ViaStrada to produce a concept and detailed design for pedestrian improvements across …
Read More

Greers / Wairakei Parking Assessment

Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for …
Read More

Kennedy-Tennyson intersection improvements

ViaStrada delivered a comprehensive solution for Tennyson Street signal-controlled intersections, integrating separated cycleways for enhanced safety …
Read More

Dunedin Bike Hubs

ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and …
Read More

Hone Heke / Cobham roundabout

Kerikeri is growing fast, and with growth comes traffic congestion. The Hone Heke / Cobham intersection is becoming more and more difficult to …
Read More

Safety of people travelling outside vehicles - deep dive review

Auckland Transport commissioned ViaStrada to carry out a wide-ranging investigation into the extent, nature and causes of serious harm to people …
Read More

Costs of road transport "accidents"

ViaStrada delivered a working paper summarising the methodology and calculations to derive estimates of the Total (Social) Costs, Average Costs, …
Read More

Whakatāne roundabout projects (x2)

ViaStrada specialises in safe, user-friendly roundabout designs. These roundabouts had unique design challenges to tackle; one constrained by …
Read More

Cycling Demand Model

ViaStrada and WSP developed a GIS and spreadsheet based cycling demand model with an accuracy that is an order of magnitude better than the existing …
Read More

Infrastructure for quick-build cycleways

Waka Kotahi commissioned ViaStrada to undertake research on quick-build (interim) cycleway infrastructure. This research note provides information …
Read More

Whakatāne Innovating Streets

ViaStrada prepared a successful funding application for our council client including issues, solutions, costs, engagement and monitoring plans.
Read More

Palmerston North urban cycling network masterplan

Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years. ViaStrada has developed a public …
Read More