This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Canterbury Regional Speed Management Plan
ViaStrada was commissioned by Environment Canterbury (ECan), on behalf of the Regional Road Safety Working Group (RRSWG), to undertake different tasks
…
Read More
Redwoodtown School - proposed crossing on Alabama Road
ViaStrada was engaged by Marlborough Roads to investigate a new pedestrian crossing on Alabama Road outside Redwoodtown School to improve safety for
…
Read More
Guppy / Meeanee intersection detailed design, Napier
In August 2018, ViaStrada prepared a scheme report assessing capacity and safety issues (including sight lines to oncoming traffic) for the signalised
…
Read More
SH2 Napier Marine Parade intersection improvements
ViaStrada was requested by Napier City Council to investigate and assess potential options for upgrading the SH2 intersection of Marine Parade and
…
Read More
Audio Tactile Profiled (ATP) Markings on rural shoulders
NZTA commissioned ViaStrada to review the corridors in the Safety Boost programme and identify areas where installing (or not) audio-tactile profiled
…
Read More
Te Tuaiwi traffic signals
ViaStrada was contracted by Whanganui District Council to design or retrofit five sets of signalised intersections so that the Te Tuaiwi pathway could
…
Read More
Latham Street cycleway, Napier - scheme design
The Latham Street – Sale Street corridor in Napier is an arterial road connecting Riverbend Road and Marine Parade over a distance of about 2.0 km.
…
Read More
Napier active transport network planning
ViaStrada undertook a city-wide cycling network evaluation (July 2018). Existing conditions auditing included video and ArcGIS data collector;
…
Read More
Blenheim roundabout upgrade
Marlborough Roads engaged ViaStrada to develop an improved roundabout design for the Alabama Road and Weld Street intersection. This site has
…
Read More
Eltham Road / Beaver Road concept plan and design
ViaStrada was commissioned to prepare a concept plan with design options for the Eltham Road / Beaver Road corridor, an important north/south
…
Read More
Auckland contra-flow cycleway options
Auckland Transport commissioned ViaStrada to develop and investigate some options for providing contraflow cycling on three suburban one-way streets.
…
Read More
NSW Fatigue-related rural road crashes & solutions
Transport for New South Wales commissioned ViaStrada to create a benefit-cost analysis tool that assesses measures that prevent fatigue-related road
…
Read More
Palmerston North roundabout safety audits
PNCC engaged ViaStrada to undertake scheme/detail design and post-construction stage road safety audits of a number of roundabout upgrades at city
…
Read More
Nazareth House - retirement and aged care village
ViaStrada designed the internal roads for Nazareth House, a retirement village and healthcare complex in Christchurch. The brief was to create a slow
…
Read More
Passing lane and overtaking opportunities
ViaStrada has been engaged to assess the recommendations of the previous studies and identify any additional locations where it may be possible to
…
Read More
South Dunedin cycle network
ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with
…
Read More
Glacier pedestrian and cycle access – safety audit
ViaStrada was engaged by DOC to carry out a post construction safety audit of the shared walking and cycle tracks to Franz Josef and Fox glaciers.
Read More
The Brook cycle access
ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a
…
Read More
Kaiapoi town centre – Integrated Transport Plan
The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers,
…
Read More
Kaiapoi heavy vehicle tracking tests
We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design
…
Read More
University to City cycle path scoping study
This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and
…
Read More