Auckland Central Motorway Junction cycleway

The New Zealand Transport agency commissioned ViaStrada to undertake a series of six audits for different sites in Auckland.
Read More

Nazareth House

ViaStrada designed the internal roads for Nazareth House, a retirement village and healthcare complex in Christchurch. The brief was to create a slow …
Read More

Palmerston North bridge assessment

During 2014, ViaStrada investigated a network of connected shared paths on the southern side (left bank) of the Manawatu River in Palmerston North and …
Read More

South Dunedin cycle network

ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with …
Read More

Dunedin cycleway network development

ViaStrada was commissioned by Dunedin City Council and NZTA to develop a cycling network for South Dunedin and the central city.
Read More

Harbourside arterial active user access

The Otago Regional Council engaged ViaStrada to identify the safety and access issues for walking and cycling along the Harbourside arterial route …
Read More

The Brook cycle access

ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a …
Read More

Kaiapoi town centre – Integrated Transport Plan

The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers, …
Read More

Hastings Walking and Cycling Strategy: beyond iWay

ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs, …
Read More

University to City cycle path scoping study

This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and …
Read More

Implementing a central city slow core in Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the …
Read More

Central city pedestrian Level of Service

Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central …
Read More

Greymouth pedestrian linkages

This study focused on enhancing the walkability of the Greymouth Town Centre.  The comprehensive final report covered high level strategic …
Read More

Earthquake recovery streetscape planning for Waimakariri District

Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create …
Read More

Road Safety Audit - Invercargill

ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy …
Read More

Long Bay network planning

Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay …
Read More

Dakota Park roundabout

ViaStrada was commissioned by Christchurch International Airport Ltd to conduct a review of a proposed roundabout at the airport.The objective of the …
Read More

Christchurch cycle network plan

Christchurch City Council (CCC) as part of the Christchurch Transport Plan (CTP) process commissioned ViaStrada to develop a GIS based cycle network. …
Read More

Hamilton central city 3-level cycling network

The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as …
Read More

Green Lights for Bikes

The Melbourne office of SKM engaged ViaStrada to peer review its draft report Green Lights for Bikes, a report on how road authorities can use a range …
Read More

Clarence Street and Dilworth Street traffic signals

As part of the Westfield expansion of Riccarton Mall, the intersection of Clarence Street and Dilworth Street was converted from a give way …
Read More