This is just a selection of some of the many projects that ViaStrada has been involved in over the years - click on the filter icon to refine the search by topic areas.
Projects
Filter
Stops and goes of traffic signals - guidance document update
ViaStrada’s update to the Stops and Goes of Traffic Signals manual is a substantial refresh of the original 2005/2006 guidance, bringing it into line
…
Read More
DOC Accessibility Audits
New Zealand’s conservation estate includes many campgrounds and walking trails that are at least partially accessible to people of all ages and
…
Read More
70 Gloucester Street End of Trip (EoT) facilities
Enhancing access for Christchurch’s active commuters, the 70 Gloucester Street upgrade adds bicycle and micro mobility parking, showers, and lockers.
…
Read More
Pukenamu Queens Park ITA and Parking Management Plan
Pukenamu Queens Park is the cultural heart of Whanganui — home to libraries, a gallery, a museum, and memorial spaces that tell the stories of our
…
Read More
Algona Road Shared Path Feasibility Study
Commissioned by Kingborough Council, ViaStrada delivered a Shared Path Feasibility Study for a proposed 3.2 km path linking Blackmans Bay and
…
Read More
Haven/Halifax business case and design review
The existing intersection of Haven Road and Halifax Street is currently controlled with a small diameter multi-lane roundabout. The adjacent land use
…
Read More
Dunedin Monitoring Framework Stocktake - Stage 1
The client has many different sources of transport information and called upon ViaStrada to help collate these, map them against the Land Transport
…
Read More
Brew Moon resource consent
Brew Moon's success means an expansion is on the cards, triggering the need to apply for a resource consent amendment. ViaStrada provided the traffic
…
Read More
Dunedin Ōtepoti Pathways Network Programme
The purpose of the Ōtepoti Dunedin Pathways Walking and Cycling Programme Business Case (PBC) is to identify an optimum investment programme to
…
Read More
Queenstown Airport parking & access concept development
A significant increase in passenger numbers at Queenstown Airport put pressure on many parts of the existing infrastructure. ViaStrada developed
…
Read More
Beale & Cullen Dental transport assessment
ViaStrada was commissioned to provide a traffic assessment for Beale and Cullen Dental practice at 393 Papanui Road for the fulfilment of a
…
Read More
Tikipunga active travel routes - Single stage business case
The Tikipunga Single Stage Business case aimed to develop both the Tikipunga route (between Central Whangārei and Tikipunga) as well as local links
…
Read More
Reducing car dependency in the Pacific Islands
John Lieswyn was recruited by the World Bank to join an international cast of subject matter experts producing a comprehensive report on ways to
…
Read More
Far North Trails Plan - Te Mahere o ta ara tawhiti ki te Raki
Te Mahere o te ara tawhiti ki te Raki, the Far North Trails Plan had the goal of developing a prioritised list of future routes to extend the walking
…
Read More
Urban Street Design Workshops
New two-day Urban Street Design workshops, developed in collaboration with NZ Transport Agency, share best practice and guidance on multi-modal urban
…
Read More
Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)
The Whangārei Citywide Walking and Cycling Network Programme Business Case (PBC)’s purpose was to reconfirm the gaps, projects, priorities, and
…
Read More
Far North District Council Urban Active Modes Plan
The Far North District Council commissioned ViaStrada and Abley to develop a geo-spatial approach to determining the annual investment required to
…
Read More
Greers / Wairakei Parking Assessment
Greers Road shops in Christchurch currently has angled parking which is being investigated to be installed as parallel parking to improve safety for
…
Read More
Whangārei Bike Hubs
ViaStrada was commissioned by WDC to scope, recommend, prioritise and design secure bike parking at various sites in Whangārei.
Read More
Dunedin Bike Hubs
ViaStrada worked with WSP and Dunedin City Council to complete a Single-Stage Business Case (SSBC) to determine secure bicycle parking needs and
…
Read More
Western Bay Sub-region Travel Demand Management (TDM) Scoping Study
ViaStrada supported Vitruvius by preparing an online StoryMap of Travel Demand Management case studies, assessing travel demand by each mode, existing
…
Read More