In order to optimise the function and safety of the route by mode and time of day, ViaStrada and Aurecon conducted si
Projects
Design & safety
Traffic Engineering, Concept & scheme design, Development traffic engineering, Intersections, Design & safety
Traffic Engineering, Safety audits & reviews, Design & safety
ViaStrada was commissioned by the Palmerston North City Council (PNCC) to undertake a NZ Transport Agency (NZTA)
Traffic Engineering, Concept & scheme design, Design & safety
ViaStrada has been engaged by Auckland Transport to provide concept designs to address outstanding issues from the Pu
Traffic Engineering, Safety audits & reviews, Design & safety
ViaStrada staff have safety audited the proposed traffic signals at the intersection of Main North Road with Belfast
Traffic Engineering, Safety audits & reviews, Design & safety
ViaStrada was commissioned by Auckland Transport to conduct a post construction safety audit of the Federal Street co
Traffic Engineering, Concept & scheme design, Intersections, SIDRA modelling, Design & safety
Meeanee Road and the northern leg of Guppy Road are designated arterials, with the southern leg of Guppy being a seco
Traffic Engineering, Safety audits & reviews
ViaStrada was commissioned by Auckland Transport to conduct a safety audit of the 85% detailed design plans for the N
Traffic Engineering, Safety audits & reviews, Design & safety
ViaStrada was engaged by Christchurch International Airport Limited (CIAL) to undertake a detail design stage road sa
Traffic Engineering, Safety audits & reviews, Walking & cycling facilities
Traffic Engineering, Concept & scheme design, Intersections
ViaStrada was contracted by Whanganui District Council to design or retrofit five sets of signalised intersections so
Planning & policy
Planning, Planning & policy
ViaStrada assisted the Far North District Council in their component of Northland Transport Alliances’ wider applicat
Policy and Strategy Development and Analysis, Speed management, Planning & policy
Planning, Strategies & masterplans
Dunedin City Council staff asked ViaStrada to set up and complete a survey of parking demand in the city centre.
Policy and Strategy Development and Analysis, Research, Strategies & masterplans
How do people arrive in our central cities?
Policy and Strategy Development and Analysis, Strategies & masterplans
The Department of Conservation commissioned a report and webmap to summarise the transportation context for the
Traffic Engineering, Planning, Strategies & masterplans
Whakatāne District Council asked ViaStrada to provide a wayfinding signage plan for Whakatāne District's walking and
Policy and Strategy Development and Analysis, Strategies & masterplans, Planning & policy
ViaStrada worked with the Client and key stakeholders to update the ten-year old active transport and recreation stra
Planning, Micro-mobility, Strategies & masterplans
The Department of Conservation (DOC) commissioned ViaStrada to create a web map application that summarizes data rela
Policy and Strategy Development and Analysis, Business cases, Strategies & masterplans
Palmerston North City Council plans to invest $2.9M in urban cycleways over the 19/20 and 20/21 financial years.
Traffic Engineering, Policy and Strategy Development and Analysis, Strategies & masterplans
To give effect to one of the six City Vision principles – “Pedal Power” – ViaStrada was commissioned to develop
Training & guidelines
Traffic Engineering Standards, Cycle planning & design, Training & guidelines
ViaStrada and Abley Transportation Consultants were commissioned by the NZ Transport Agency to develop a national framework of guidance for planning and designing for cycling. This project came as a result of the NZ Cycling Safety Panel identifying a need for further guidance and was supported by industry feedback.
Traffic Engineering Standards, Cycle planning & design, Training & guidelines
ViaStrada was commissioned to undertake an investigation of possible separation devices for protected pathways that a
Planning, Cycle planning & design, Strategies & masterplans
South Dunedin Strategic Cycle Network (Jan 2012 – Jan 2013) included planning and engineering for six routes delivere
Traffic Engineering Standards, Cycle planning & design
ViaStrada developed the cycling-related content for the region-wide Code of Practice, including a lexicon for cycling
Traffic Engineering Standards, Cycle planning & design
Review of all signs and markings relevant to cycling (official and unofficial) to determine whether current legislati
Traffic Engineering, Concept & scheme design, Cycle planning & design
ViaStrada provided cycle network advice to support the scheme assessment stage of road development in the Long Bay ar
Traffic Engineering, Concept & scheme design, Development traffic engineering, Intersections, SIDRA modelling
ViaStrada was commissioned by Christchurch International Airport Ltd to conduct a review of a proposed roundabout at the intersection of Ron Guthrey Drive and two new roads, which would form part of the new Dakota Park development precinct at the airport. The development will provide a high standard of accommodation for warehousing, logistics industries and other businesses.
The objective of the review was to determine if the land required for the proposed roundabout was appropriate and whether the proposed design was safe and had capacity for the future.
Planning, Pedestrian planning & design, Safety audits & reviews, Design & safety, Training & guidelines
ViaStrada has provided transport planning advice to the Christchurch City Council with respect to the transport-related provisions in the Christchurch City Plan to support the Central City South Master Plan. The master plan was adopted by Council in May 2009 and established the main characteristics (desired outcomes) that Council is seeking to encourage for the precinct.
Traffic Engineering, Policy and Strategy Development and Analysis, Concept & scheme design, Cycle planning & design, Design & safety, Training & guidelines
The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as identification of current and potential cycle routes.
Project Background
Based upon the Hamilton Cycle Network Strategy Report (1999), Hamilton City Council has embarked on a ten-year programme to construct a city-wide cycle network.
Policy and Strategy Development and Analysis, Cycle planning & design, Training & guidelines
Research & trials
Planning, Research
The Department of Conservation (DOC) commissioned ViaStrada to review a range of planning documents and provide advic
Training and Research, Traffic control device (TCD) trials
A formal Traffic Control Device trial of directional cycle signals has been approved for four locations; two in Chris
Traffic Engineering, Concept & scheme design, Research, Walking & cycling facilities, Design & safety, Research & trials
ViaStrada was commissioned by the NZTA to identify up to five intersections with the highest recorded crashes, invest
Training and Research, Research, Micro-mobility
This research report presents a review of overseas legislation, technology trends, market and safety analyses for low
Policy and Strategy Development and Analysis, Training and Research, Research, Research & trials
On behalf of the NZ Transport Agency, ViaStrada is conducting research to evaluate the safety challenges of e-bikes and other low-powered vehicles (mobility scooters, e-skateboards, e-unicycles, etc). The aim is to generate a set of regulatory and non-regulatory options for addressing those issues in the New Zealand context.
Background
Traffic Engineering Standards, Training and Research, Research, Research & trials
- In 2016, the IPENZ Transportation Group committee granted their annual study award to Megan Fowler (ViaStrada). Megan's study focuses on ways of addressing the conflicting movements of bicyclists and motorists at signalised intersections involving protected bike lanes.
Policy and Strategy Development and Analysis, Business cases, Research, Strategies & masterplans
Transport for New South Wales commissioned ViaStrada to create a benefit cost analysis tool that assesses measures th
Planning, Research, Strategies & masterplans
During 2014, ViaStrada investigated a network of connected shared paths on the southern side (left bank) of the Manaw
Traffic Engineering, Training and Research, Research, Traffic control device (TCD) trials
ViaStrada has been commissioned by VicRoads to undertake research on physical bicycle lane separators.
Traffic Engineering, Traffic control device (TCD) trials, Research & trials
ViaStrada was commissioned by Waimakariri District Council (WDC) to investigate and quantify the pedestrian activity