Projects
Filter
Glacier pedestrian and cycle access – safety audit
ViaStrada was engaged by DOC to carry out a post construction safety audit of the shared walking and cycle tracks to Franz Josef and Fox glaciers.
Read More
The Brook cycle access
ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a
…
Read More
Williams Street pedestrian count
ViaStrada was commissioned by Waimakariri District Council (WDC) to investigate and quantify the pedestrian activity at five locations on Williams
…
Read More
Red light camera pilot evaluation report peer review
ViaStrada was commissioned by Auckland Transport to edit and review a red light camera pilot evaluation draft report and provide an international
…
Read More
Kaiapoi town centre – Integrated Transport Plan
The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers,
…
Read More
Kaiapoi heavy vehicle tracking tests
We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design
…
Read More
Hastings Walking and Cycling Strategy: beyond iWay
ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs,
…
Read More
University to City cycle path scoping study
This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and
…
Read More
Implementing a central city slow core in Christchurch
Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the
…
Read More
Central city pedestrian Level of Service
Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central
…
Read More
Selwyn District plan review
The Selwyn District Council (SDC) proposes to revise the District Plan's transport provisions to ensure they reflect the strategic direction of
…
Read More
Greymouth pedestrian linkages
This study focused on enhancing the walkability of the Greymouth Town Centre. The comprehensive final report covered high level strategic
…
Read More
SH1 Invercargill roundabout
ViaStrada was engaged by the NZTA to carry out a detail design stage safety audit of a proposed roundabout on Tay Street, Invercargill.
Read More
Public transport for Christchurch rebuild
ViaStrada assisted CCC in reviewing options for rapid public transport services to various Christchurch suburbs and provided advice on central city PT
…
Read More
Earthquake recovery streetscape planning for Waimakariri District
Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create
…
Read More
Peer review of proposed Walding Street upgrade - Palmerston North
ViaStrada was commissioned by Palmerston North City Council to peer review the concept plans of proposed changes to Walding Street, an arterial road
…
Read More
Road Safety Audit - Invercargill
ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy
…
Read More
Albert/Grey Roundabout design audit, Palmerston North
Preliminary design stage safety audit of a proposed roundabout at the intersection of a local road and a collector road. The roundabout is to replace
…
Read More
Traffic signal audit on State Highway 73
ViaStrada undertakes a detail design stage safety audit of a new traffic signals for the “Noble Village” subdivision access to the southern side of
…
Read More
Safe Routes to School evaluation
ViaStrada was commissioned by Auckland Transport to conduct a crash analysis of pedestrian and cyclist crashes for the five years prior and three
…
Read More
Long Bay network planning
Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay
…
Read More