Dunedin cycleway network development

ViaStrada was commissioned by Dunedin City Council and NZTA to develop a cycling network for South Dunedin and the central city.
Read More

Auckland Cycling Code of Practice

Auckland Transport commissioned ViaStrada to develop the cycling-related content for the region-wide Code of Practice.
Read More

Harbourside arterial active user access

The Otago Regional Council engaged ViaStrada to identify the safety and access issues for walking and cycling along the Harbourside arterial route …
Read More

SH1 Caversham Valley Road safety audits

ViaStrada was engaged by the NZTA to undertake the detail design and post-construction stage road safety audits of this major upgrade of Dunedin’s …
Read More

Review of cycleway signs and markings

The NZ Transport Agency entrusted ViaStrada with a review of all cycling-related signs and markings in New Zealand to determine whether current …
Read More

Cycle lane separators

ViaStrada has been commissioned by VicRoads (the state roading authority of Victoria, Australia) to undertake research on physical bicycle lane …
Read More

Glacier pedestrian and cycle access – safety audit

ViaStrada was engaged by DOC to carry out a post construction safety audit of the shared walking and cycle tracks to Franz Josef and Fox glaciers.
Read More

The Brook cycle access

ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a …
Read More

Williams Street pedestrian count

ViaStrada was commissioned by Waimakariri District Council (WDC) to investigate and quantify the pedestrian activity at five locations on Williams …
Read More

Red light camera pilot evaluation report peer review

ViaStrada was commissioned by Auckland Transport to edit and review a red light camera pilot evaluation draft report and provide an international …
Read More

Kaiapoi town centre – Integrated Transport Plan

The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers, …
Read More

Kaiapoi heavy vehicle tracking tests

We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design …
Read More

Hastings Walking and Cycling Strategy: beyond iWay

ViaStrada was engaged by Hastings District Council to develop a concise walking and cycling strategy, a list of projects with rough order costs, …
Read More

University to City cycle path scoping study

This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and …
Read More

Implementing a central city slow core in Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the …
Read More

Central city pedestrian Level of Service

Christchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central …
Read More

Selwyn District plan review

The Selwyn District Council (SDC) proposes to revise the District Plan's transport provisions to ensure they reflect the strategic direction of …
Read More

Greymouth pedestrian linkages

This study focused on enhancing the walkability of the Greymouth Town Centre.  The comprehensive final report covered high level strategic …
Read More

SH1 Invercargill roundabout

ViaStrada was engaged by the NZTA to carry out a detail design stage safety audit of a proposed roundabout on Tay Street, Invercargill.
Read More

Public transport for Christchurch rebuild

ViaStrada assisted CCC in reviewing options for rapid public transport services to various Christchurch suburbs and provided advice on central city PT …
Read More

Earthquake recovery streetscape planning for Waimakariri District

Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create …
Read More