Blenheim roundabout upgrade

Marlborough Roads engaged ViaStrada to develop an improved roundabout design for the Alabama Road and Weld Street intersection. This site has …
Read More

Eltham Road / Beaver Road concept plan and design

ViaStrada was commissioned to prepare a concept plan with design options for the Eltham Road / Beaver Road corridor, an important north/south …
Read More

Auckland contra-flow cycleway options

Auckland Transport commissioned ViaStrada to develop and investigate some options for providing contraflow cycling on three suburban one-way streets. …
Read More

Palmerston North roundabout safety audits

PNCC engaged ViaStrada to undertake scheme/detail design and post-construction stage road safety audits of a number of roundabout upgrades at city …
Read More

Nazareth House

ViaStrada designed the internal roads for Nazareth House, a retirement village and healthcare complex in Christchurch. The brief was to create a slow …
Read More

South Dunedin cycle network

ViaStrada was engaged to develop the first package of concepts and scheme designs for the South Dunedin Cycle Network, providing cycle facilities with …
Read More

The Brook cycle access

ViaStrada was engaged by Nelson City Council to provide a concept design including cross sections, rough order costs and scheme alignment plans for a …
Read More

Kaiapoi town centre – Integrated Transport Plan

The Kaiapoi Town Centre, Integrated Transport Plan involved site visits, consultation with stakeholders including trucking firms and retailers, …
Read More

Kaiapoi heavy vehicle tracking tests

We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design …
Read More

University to City cycle path scoping study

This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and …
Read More

Implementing a central city slow core in Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This 2011 ViaStrada project suggested the …
Read More

Greymouth pedestrian linkages

This study focused on enhancing the walkability of the Greymouth Town Centre.  The comprehensive final report covered high level strategic …
Read More

Earthquake recovery streetscape planning for Waimakariri District

Following the 4 September 2010 earthquake, ViaStrada was engaged by Waimakariri District Council to provide traffic engineering advice to create …
Read More

Road Safety Audit - Invercargill

ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy …
Read More

Long Bay network planning

Auckland Transport commissioned ViaStrada to provide cycle network advice supporting the scheme assessment stage of road development in the Long Bay …
Read More

Dakota Park roundabout

ViaStrada was commissioned by Christchurch International Airport Ltd to conduct a review of a proposed roundabout at the airport.The objective of the …
Read More

Transport planning advice for City Plan/Master Plan alignment

ViaStrada has provided transport planning advice to the Christchurch City Council with respect to the transport-related provisions in the Christchurch …
Read More

Review of transport provisions in Christchurch District Plans

ViaStrada has provided technical assistance to the Christchurch City Council with respect to its review of transport-related provisions in the …
Read More

Hamilton central city 3-level cycling network

The Hamilton City Council commissioned ViaStrada to undertake a review of physical barriers to cycling in the Hamilton central city, as well as …
Read More

Clarence Street and Dilworth Street traffic signals

As part of the Westfield expansion of Riccarton Mall, the intersection of Clarence Street and Dilworth Street was converted from a give way …
Read More

Hornby to Prebbleton rail trail

ViaStrada was engaged by Christchurch City Council to undertake the scheme design of the Hornby to Prebbleton part of the Christchurch to Little River …
Read More